• July

      6

      2018
    • 98
    • 0
    Moving Mountains, it’s all in a days work

    Moving Mountains, it’s all in a days work

    How amazing is this view, such a fantastic thing to be the waste contractor on such a major development, piece of history right here !.. Toowoomba Second Range Crossing. The Toowoomba Second Range Crossing (TSRC) will bring $2.4 billion over 30 years of economic and productivity gain for business and industry to Toowoomba. When completed,

    • July

      4

      2018
    • 56
    • 0
    Dome Bunkers go up at Gundy

    Dome Bunkers go up at Gundy

    One of the first things we did was lay down some 300 square metres of concrete as a platform to our cardboard baling machine. Of course this all has to be kept dry, so our team of very capable workers set about constructing a couple of Dome Bunkers. This included prefabricated walls. We will now

    • July

      4

      2018
    • 58
    • 0
    Oakey Solar Farm

    Oakey Solar Farm

    We have a team of workers at the Oakey Solar Farm, keeping the worksite clean and tidy. Now, that may not seem like a significant statement, but if you consider that every single component that is installed at a Solar Power Plant is packed in plastic, foam, plastic binding and finally a box!… Multiply this

    • July

      1

      2018
    • 48
    • 0
    Recycling collection begins this week

    Recycling collection begins this week

    Thats right, Monday morning is the start of recycling bin collection. Get your bin kerb-side by 6am on the same day as your general bin (only once a fortnight). When placing your bins remember to leave a gap, keep cars free from blocking access to your bins. If you run into a problem please call

    • July

      1

      2018
    • 46
    • 0
    State of the Art Trucks

    State of the Art Trucks

    That’s right, recycling has begun! E&E Waste started collection on the 2nd July 2018. Before that date residents will receive their Yellow-top Wheelie Bins and Information Pack provided by GRC with all they need to know about recycling. The new E&E Waste wheelie-bin trucks are installed with an on-board management system that includes cameras and

COST CALCULATOR

Use our form to estimate the initial cost of renovation or installation.

REQUEST A QUOTE
Latest Posts
Most Viewed
Text Widget

Here is a text widget settings ipsum lore tora dolor sit amet velum. Maecenas est velum, gravida Vehicula Dolor

© Copyright 2018 Renovate Theme by QuanticaLabs